Metered charges 2025/2026

Homes with a water meter

Metered charges are made up of three elements - water supply, used water and surface water drainage.

Water supply and used water charges are based on the volume of water used. The amount used is calculated based on the difference between two meter readings.

Metered water supply charges

  Zone 1 to 8 Zone 9 Zone 10
Standing charge (£ per year)  50.17  50.17  50.17 
Volumetric charge (£ per m3)  2.6080  2.4031  2.4709 

Metered water supply charges | Water Smart tariff trial

Standing charge (£ per year)  39.07 
Essential block (1) 0-5m3 per month  1.0432 
Standard Block (2) 5-10m3 per month  2.6080 
Premium Block (3) >10m3 per month  6.5201 

Metered used water charges | Zone 1 to 8

Volumetric charge Charge £ per m3
Volume discharged directly or indirectly to a public sewer  1.5004 
Volume discharged directly to our treatment works  1.1455 
Fixed charge Charge £ per year

Used Water

39.32

Highway Drainage

17.48 

Metered used water supply charges | Water Smart tariff trial

Standing charge (£ per year)  39.32 
Highway Drainage (£ per year)  17.48 
Essential block (1) 0-5m3 per month  0.4502 
Standard Block (2) 5-10m3 per month  1.5004 
Premium Block (3) >10m3 per month  3.7511 

Metered household surface water drainage charges | Zones 1 to 8

If your surface water drainage charges are based on your home's rateable value (RV).

 

Fixed charge £ per annum
All Zones 5.41
Charging zone Rate per £ of RV
0.2344 
0.1794 
0.2081 
0.2392 
0.2392 
0.2273 
0.2201 
0.2057 

If your surface water drainage charges are based on the type of property.

 

Type of premises Charge £ per year

Detached house (including link-detached):

65.20 

Semi-detached house

43.46 

Other household premises

21.74 

Charge for meter testing for meters up to and including 28mm

Charge for meter testing for meters up to and including 28 mm
£70.00